Malaysia
# |
Name |
Current Liabilities |
Reported Date | Stock Price |
Change |
Price (30 days) | Country |
---|---|---|---|---|---|---|---|
1 |
USD 1.71 B
|
July 31, 2024 | USD 1.01 | 1.96% |
|
Malaysia |
|
2 |
USD 1.06 B
|
March 31, 2024 | USD 0.55 | -0.50% |
|
Malaysia |
|
3 |
USD 370.14 M
|
Dec. 31, 2023 | USD 0.88 | 2.27% |
|
Malaysia |
|
4 |
USD 217.20 M
|
June 30, 2024 | USD 0.43 | -0.09% |
|
Malaysia |
|
5 |
USD 124.68 M
|
Dec. 31, 2023 | USD 0.37 | -0.09% |
|
Malaysia |
|
6 |
USD 98.07 M
|
March 31, 2024 | USD 0.38 | -1.26% |
|
Malaysia |
|
7 |
USD 92.36 M
|
Dec. 31, 2023 | USD 0.48 | 3.32% |
|
Malaysia |
The Engineering Services company in Malaysia with the highest Current Liabilities is Gamuda Berhad (Kuala Lumpur Stock Exchange: 5398.KL) at USD 1.71 B.
The Engineering Services company in Malaysia with the lowest Current Liabilities is Dayang Enterprise Holdings Bhd (Kuala Lumpur Stock Exchange: 5141.KL) at USD 92.36 M.
The top 10 Engineering Services companies in Malaysia by Current Liabilities are Gamuda Berhad, IJM Corporation Berhad, Sunway Construction Group Bhd, Dialog Group Berhad, Favelle Favco Berhad, AME Elite Consortium Berhad and Dayang Enterprise Holdings Bhd.
The bottom 10 Engineering Services companies in Malaysia by Current Liabilities are Dayang Enterprise Holdings Bhd, AME Elite Consortium Berhad, Favelle Favco Berhad, Dialog Group Berhad, Sunway Construction Group Bhd, IJM Corporation Berhad and Gamuda Berhad.